November 02, 2010
1
Refer to the exhibit. An administrator documented the output of a CAM table from an Ethernet switch as shown. What action will the switch take when it receives the frame shown at the bottom of the exhibit?
discard the frame
forward the frame out port 2
forward the frame out port 3
forward the frame out all ports
forward the frame out all ports except port 3
add station 00-00-3D-1F-11-05 to port 2 in the forwarding table
2
Refer to the exhibit. An administrator issues the commands as shown on SwitchB. What is the result for port Fa0/22?